- Product Categories
- Friendly Links
- home > Supply > [Longyan 0.8 cm drainage board] & Sanming plastic drainage board garage ※ high compressive strength, off constantly
[Longyan 0.8 cm drainage board] & Sanming plastic drainage board garage ※ high compressive strength, off constantly
Information Name: | [Longyan 0.8 cm drainage board] & Sanming plastic drainage board garage ※ high compressive strength, off constantly |
Published: | 2015-05-16 |
Validity: | 3000 |
Specifications: | 0.8-6.0 |
Quantity: | 800000.00 |
Price Description: | |
Detailed Product Description: | [Longyan 0.8 cm drainage board] & Sanming plastic drainage board garage ※ high compressive strength, off constantly. The company is the only company specializing in the production of Tai'an drainage board manufacturers, complete specifications, customer confidence business. Drainage board green composite drainage board and fiberglass geogrid and other geosynthetics Treatment of semi-rigid pavement reflection cracking application technology geotextile composite geotextile currently is a low cost, effective and Treatment Measures simple, they are worth in practical work in the future application. In addition, damaged geotextile repair work can be carried out, related application on geotextiles increase in the current situation has become increasingly common, the majority of users of its products have been gradually recognized by the application of the product can be learned: Drainage board has excellent filtration, outstanding asphalt rubber oil adsorption. [Longyan 0.8 cm drainage board] & Sanming plastic drainage board garage ※ high compressive strength, off constantly present, the research reinforced composite drainage board mechanism should be further improved design methods for further improvement and unification. Because the working mechanism of geotextile reinforcement materials in the soil, and if by some calculation method currently recommended safety factor is very limited. The actual degree of safety engineering there is a huge increase. To address this sub-shield, it is necessary to recognize the working mechanism of geotextile base L, propose new reinforced design calculation. The use of geotextile solid roadbed or road rail and road, both in theory and practice rapid progress. Especially under dynamic loads. Research on the use of geotextile to prevent the pumping phenomenon of attention of many experts, the drainage board through analysis and practice. Prove thicker needle-like nonwoven fabric to prevent or mitigate the pumping phenomenon, the effect is obvious. For proper operation of geotextiles construction process is the first crack in the asphalt road surface evenly sprayed rubber oil, between holes and fabric layer, then layer on the hot pavement. Drain the hot pavement layer should be able to absorb the oil fabric glue so that it gets under full, it needs the fabric has outstanding adsorption capacity. In its operation, but also often produce damaged geotextile, then do not waste away, they are able to repair patched geotextile can be reused from some extent, but also reduces our production costs. [Longyan 0.8 cm drainage board] & Sanming plastic drainage board garage ※ high compressive strength, off constantly Construction Notes: 1. Technical performance pay attention to drainage board design requirements should be inspected for each batch of product sampling approach is applied only after ; 2. Before construction control of geological data, to make the necessary contact hole inspection test the waters within the precincts arranged drainage holes to avoid underground obstacles encountered when applying drainage holes to play. Do not exceed the design depth exploration holes deep hole 60CM; 3. underground obstacle when it comes to scoring or can not continue to make the hole is tilted more than tolerance, it should dispose of the hole and the shift away from extubation about 45CM, again playing drainage facilities hole; 4. drainage holes - administration process to be used, is contained pushed vibration method, it has been hit the depth of the design requirements, not allowed to hammer tamping; 5. drainage board during shipment and storage, to be wrapped in thick protective layer, at the construction site storage pay attention to sun and mud, dust contamination or other object collision damage; 6. Drain the interpolation process is applied, should pay attention to whether real when inserting into the soil, or in extubation mandrel, drainage Bring back to the plate, you can always pay attention to consumption (or automatic recording device) in a roll of plastic sheet; 7. Set proper preload sink observation point, attention staged loading amount of compression and uniformity; 8 To implement the construction site temporary electrical safety specifications, to avoid accidents. [Longyan 0.8 cm drainage board] & Sanming plastic drainage board garage ※ high compressive strength, off constantly our adherence to the "quality first, credit first" business purpose for our customers to produce quality products and provide satisfactory service. We sincerely welcome foreign businessmen to visit negotiation, work together, the total development plans. |
Admin>>>
You are the 8933 visitor
Copyright © GuangDong ICP No. 10089450, Tai'an City Green Building Materials Co., Thailand All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 8933 visitor
Copyright © GuangDong ICP No. 10089450, Tai'an City Green Building Materials Co., Thailand All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility